Aug 28: Working on the walkout/porch concrete forms, gravel delivery, ThermoPEX

So far today has been a rather quiet day on the construction front 🙂

On the back walkout area, the framer is finishing up the forms/rebar/gravel for the concrete footings and slab. There are also pier locations for the posts that will support the back porch.

Two loads of 1″ gravel delivered by Scott today for bedding in the ThermoPEX, PEX, conduit and ethernet (they’re all run in the same 2′ ditch)

Martin Plumbing is coming out later today to do more work on the water and heating. I’ll be helping run Ethernet (cat6 burial, pure copper) and electrical (10/3).